Here is the list of tasks that I tried to convey to decorating team when I met them on Friday afternoon. Its a lot to ask and I hope thye can do these tasks:
- Remove boards from windows
- All windows cleaned, sanded, primed and gloss painted (internally and externally)
- External walls cleaned (jet washed)
- Jet wash rear path into building
- All external doors cleaned, sanded, primed and painted
- Internal woodwork and doors cleaned, sanded, primed and painted
- Internal ceilings painted white matt
- Internal decoration - radiators, pipes, skirting boards and walls painted (main room and all sub rooms (inc. toilets)
- Floors cleaned
- Remove brown boards from main floor
- Sand main floor and treat with low maintenance clear wood treatment
- Replace toilet seats with new items
- Replace toilet roll holders with new items
- Retain kitchen and clean up kitchen unit s & area - then decorate kitchen shell (tiles to stay in place if possible)
- Oil tank plinth area - remove weeds and tidy, repair oil tank plinth
- Clean and decorate stage area
This evenings task is less dramatic but is required. I need water to a loo and water for work / drinks. I hope he can fit us in. Whilst I'm there I will feed a power line into the hall from the club and this should be OK for a few days - until a proper electrician can do the business.
The pressure is on. If the weather turns rough, the decoration team may be with us tomorrow morning!
Meanwhile, Leo has been out and bought more cleaning / docrating equipment, plus the mandatory biccies.
I'm out tonight, but I do need to get some admin done (mostly writing begging letters to institutions and the local planning / Councils. This project is really on the move!