- Main door hinges replaced as required (same as fitted, but expect we need heavier ones)
- Window hinges - two screws still required - at least its no longer hanging off
- Replacement barrels on Yale locks
- Cleaned the most blocked bits of guttering
- Removed a coat rack in the ladies toilets
- Hacked back loose plaster in the ladies toilets
- Removed damaged ceiling board in the ladies toilets
The magnolia on the walls (a tester) from last night isn't dry, so couldn't put on another coat (it will need it).