Sunday: Team effort nibbles more small jobs

Akela, Mowgli, Dan, Andrew, Skip and Ivor pitched up and attacked the following:
  • Main door hinges replaced as required (same as fitted, but expect we need heavier ones)
  • Window hinges - two screws still required - at least its no longer hanging off
  • Replacement barrels on Yale locks
  • Cleaned the most blocked bits of guttering
  • Removed a coat rack in the ladies toilets
  • Hacked back loose plaster in the ladies toilets
  • Removed damaged ceiling board in the ladies toilets
This included a trip to B&Q for more plaster board and hinges.

The magnolia on the walls (a tester) from last night isn't dry, so couldn't put on another coat (it will need it).