- Main door hinges replaced as required (same as fitted, but expect we need heavier ones)
- Window hinges - two screws still required - at least its no longer hanging off
- Replacement barrels on Yale locks
- Cleaned the most blocked bits of guttering
- Removed a coat rack in the ladies toilets
- Hacked back loose plaster in the ladies toilets
- Removed damaged ceiling board in the ladies toilets
The magnolia on the walls (a tester) from last night isn't dry, so couldn't put on another coat (it will need it).
No comments:
Post a Comment