Yesterday saw the old boiler removed and the first phase of a new heating system carried out which included fitting a new condensing boiler. A new flu has appeared at the side of the building and the old boiler was lugged away for (other!) uses by the Rabbit.
Akela replaced the mens toilet seat with nice new a plastic white job. The previous seat had broken at the hinge.
Two fire extinguishers had been swung on by small people, so they were rehung this morning... With MUCH BIGGER screws.
Some external pipe holes (in he wall) were sealed in the kitchen and this should reduce heat loss (a little).
A booking for a childrens party has just got underway. Tables were pulled from under the stage for use during the party.
Finally, Jan has sown the header tape onto the stage curtains and they were hung by Akela and Leo. Whilst they look brilliant (with the hooks moved to the lowest setting), the curtains are not opening and closing as they should (they still move). We can look at the mechanism in a few days as the curtains can be manually opened and closed.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment