We now have a cock fitted to the tank (a good thing for when the delivery is made).  Friday saw pipework from the boiler to the heating pipes put in place.  An additional expansion vessel was added (its a big system) and a guard was placed around the external flue (the flue sticks out of the external wall).

We expect electrical side of things to be installed on Sunday.  The pump for the radiators is already in place.

The plan is to run the system for a few days with no controls, to get the dirt moving in the system, flush things out and then fit a valve to control heat to the radiators.

Unlike my home system, I do not aspire to have a tropical outcome and will be happy with the chill being taken off the room (anything more may be very expensive). That said, looking at the system so far, it looks like the boiler will be capaple fo heating up the main hall.

We expect a fire valve and line from the tank to be installed on Sunday.  Martin and Simon will use a diamond cutter to place a pipe into the concrete and run it into the boiler room.