Contact me here to make a booking

Name

Email *

Message *

Monday, 28 September 2009

Hard labour

The skip was picked up this morning.  Full of earth plus my old faithful wheelbarrow, its back broken by the strain.

Shuttering is now in position for a slab pour tomorrow.  We have the free loan of a concrete mixer and the materials have been ordered to arrive tomorrow morning.  When you dont order or lay concrete, arriving at the right amounts can be fraught (thanks to Baggy for use of his worry beads).

The stage has been cleared of kit, with the bulk of the equipment placed in racks in the loft.  This was no mean feat.  I admit that this did include a trip to the local 'civic amenity site' (the rubbish tip).

Thanks to Mowgli for his help (part repaid by taking him out to lunch).

Tomorrow will be a heavy day and given one cubic metre of concrete is 2.2 tonnes, we will have our work cut out moving 325kg of cement and three bags of balast (we need 1850kg, but I had to order more than we need), we can expect the day to be hard one.

19:40 Update:  Just been and bought another wheelbarrow.  My last one died as Mowgli dumped earth in the skip.  I feel justified getting a new one, as the old one was much loved.  RIP Ronny the wheelbarrow.

No comments:

Post a Comment