Saturday, 26 September 2009

Clearing and digging

I am a broken man!  Today started at 07:50 with me looking to intercept delivery and pay for a skip.  The skip was already there (I had coned off the area the evening before).  The morning saw Mowgli, the Veveri and Akela attack the mess of concrete in prep for a new tank base.

We had just stopped (Akela's wheel barrow died and after a moving ceremony was placed in the skip) when Steve G pitched up.  He worked like a trojan and Akela re-joined him.  Martin Farmer pitched up and he attacked the job viciously.  Frank joined us and by ten to six in the evening, we are ready for hard core to be placed.

We need to buy some shuttering for the sides of the hole, but progress today has been massive.  A big thank you to all who helped.

At the start of the day, Dan and Akela placed significant amounts of clobber (that had been in the Scout garage) from the stage, into the loft.

I hurt.  I am not used to this kind of hammering, but I can say that we have made significant progress towards getting the heating back on-line.