Sorry if this is more like 'twitter', but Leo and Akela have just cut and positioned the new kitchen unit tops. Thanks to Steve B for the loan of his circular saw etc. They need screwing in place, - screws and brackets are already in place. A nibble needs to be removed from the back of the bigger surface (near the pipe).
This gets the wood out of the kitchen and really lifts the kitchen.
Still no sign of cheap / free floor covering, so the search continues...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment