This morning saw a group of us arrive at 09:30. A 25mm hole was drilled through the South wall, so that the electricity supply cable can enter the building. After much measuring and counting of brinks, we created the hole. From the outside it rises, so that rain water wont enter the building. Looking through the hole, it is now clear that the walls do have a cavity (I thought they were solid).
The plinth at the rear of the building (used for an oil tank base) had about a ton of soil removed and the area to the East if it was cleared and made flat, ready for a concrete base that our gas cage will stage (be bolted) on.
We removed soil that was compromising the Clubs DPC. It seemed a reasonable thing to do, given Darren had intended to do this work and we were in the working in that area.
I have to make mention of the extensive (nay impressive) array of tools the Veveri has with him. Without him being kitted out, we would have struggled on a number of counts.
Inside, the newly relocated bits of wood that will have coat hooks fitted on, were painted.
Having clearly felt my standards are very low in the ironing department, Jan took down the curtains and carried them home to iron the creases out.
We disposed of the soil and finished at 12:10. Just in time for the Spanish Grand Prix...