Wednesday 29 April 2009
The first coat of oil is drying
First coat is drying. This modern oil mixture is based on an old favourite - linseed oil. It will be non slip and easy to repair. The floor looks darker than the test area dried, but I already think it looks very good. See picture above.
Oil drying time is 12 to 18 hours, so I am unsure if it will be dry enough to get the second coat applied tomorrow.
Our favourite plumber called today. He should be with us for another session on Saturday morning. Rob Hall (as many of you may know) is my hero. He sorted out my house central heating whilst I was away on holiday. He could have ripped me off, but he didn't and I can only commend his honesty and professionalism.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment